[Date Prev][Date Next] [Chronological] [Thread] [Top]

Re: releng plans



Kurt D. Zeilenga wrote:

Here is a brief summary of my release engineering
thoughts.  These dates are, of course, WASGs.

1) Release 2.2.16 by 2 Sept.
2) Move 2.1 to "historic' by 9 Sept.
3) HEAD cleanup (unifdef/rm cruft) by 16 Sept.
4) branch OPENLDAP_REL_ENG_2_2 by 23 Sept.
5) Alpha 2.3 by 30 Sept.


Well, that sounds good to me except back-config will still be creaking along, it should be in shape a week or so after Sep 30.

--
 -- Howard Chu
 Chief Architect, Symas Corp.       Director, Highland Sun
 http://www.symas.com               http://highlandsun.com/hyc
 Symas: Premier OpenSource Development and Support